| FAchada hidrolavado mas rajaduras |
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Incafrent | 0 | 0 | 0 | 0 | $0 | $0 | |
| Sellador Fijador | 0 | 0 | 0 | 0 | $0 | $0 | |
| Revoques | 1 | 1 | 1 | 11 (11 M2) | $280 | $3080 |
| TOTAL MATERIALES | $3080 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | 1 | 7 | $21408.37 | ||
| Finalista | 1 | 8 | $25617.32 | ||
| ALT1 | 1 | 7 | $4550 | ||
| ALT2 | 1 | 8 | $2960 | ||
| Peon | 1 | 4 | $9835.1 | ||
| Oficial | 1 | 5 | $15716.19 |
| MANO DE OBRA | $64389.38 | ||
| TOTAL CON UTILIDAD | $122339.822 |
| JORNALES TRANSCURRIDOS | 54 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 420 | 12 | 5040 | 11901.9 |
| Hidrolavado | 2 | 3 | 420 | 50 | 21000 | 35705.7 |
| Arreglos | 3 | 3 | 420 | 63 | 26460 | 35705.7 |
| Pintura de paredes | 4 | 0 | 0 | 0 | 0 | 0 |
| extra | 5 | 1 | 0 | 0 | 0 | 11901.9 |
| Arreglo Balcones | 6 | 0 | 0 |
| TOTAL JORNALES X DIAS | $95215.2 | ||||
| TOTAL TAREAS | $52500 | ||||
| DIAS TOTALES | 8 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $7243.81 | USD 200.11 |
| UTILIDAD / MAT+M.O. | 86 % | |
| MANO OBRA | $64389.38 | USD 1778.76 |
| MATERIALES | $3080 | USD 85.09 |
| SYSO | $8000 | USD 221 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $57950.44 (90 %) | USD 1600.89(90 %) |
| SUBTOTAL | $133419.82 | USD 3685.73 |
| BPS | $37192.416 | USD 1027.44 |
| IRPF | $0 | USD 0 |
| IVA | $29352.36 | USD810.86107351032 |
FINANCIACION SELECCIONADA:
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | Interes 0 % | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 0 cuotas | $INF | $INF | USD INF | $NAN | USD NAN |
OTRAS FINANCIACIONES:
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $54257.39 | $11936.63 | USD 329.75 | ||
| 6 | $27128.7 | $5968.31 | USD 164.87 | $6147.36 | USD 169.82 |
| 10 | $16277.22 | $3580.99 | USD 98.93 | $3831.66 | USD 105.85 |
| 12 | $13564.35 | $2984.16 | USD 82.44 | $3222.89 | USD 89.03 |
| 18 | $9042.9 | $1989.44 | USD 54.96 | $2148.6 | USD 59.36 |
| 24 | $6782.17 | $1492.08 | USD 41.22 | $1611.45 | USD 44.52 |
| 36 | $4521.45 | $994.72 | USD 27.48 | $1074.3 | USD 29.68 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTOS HIJOS

PRESUPUESTO ALT1109
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| alquiler del hidrolavado | 0 | 0 | 0 | 0 (11 M2) | $0 | $0 |
| TOTAL MATERIALES | $0 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | 0 | 0 | $0 | ||
| MedioOf | 0 | 0 | $0 | ||
| ALT1 | 0 | 0 | $0 | ||
| ALT2 | 0 | 0 | $0 | ||
| Finalista | 0 | 0 | $0 |
| MANO DE OBRA | $0 | ||
| TOTAL CON UTILIDAD | $0 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Hidrolavado | 1 | 0 | 0 | 0 | 0 | 0 |
| TOTAL JORNALES X DIAS | $0 | ||||
| TOTAL TAREAS | $0 | ||||
| DIAS TOTALES | 0 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $NAN | USD NAN |
| UTILIDAD / MAT+M.O. | NAN % | |
| MANO OBRA | $0 | USD 0 |
| MATERIALES | $0 | USD 0 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $0 (0 %) | USD 0(0 %) |
| SUBTOTAL | $0 | USD 0 |
| BPS | $0 | USD 0 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $0 | $0 | USD 0 | ||
| 6 | $0 | $0 | USD 0 | $0 | USD 0 |
| 10 | $0 | $0 | USD 0 | $0 | USD 0 |
| 12 | $0 | $0 | USD 0 | $0 | USD 0 |
| 18 | $0 | $0 | USD 0 | $0 | USD 0 |
| 24 | $0 | $0 | USD 0 | $0 | USD 0 |
| 36 | $0 | $0 | USD 0 | $0 | USD 0 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO ALT1110
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Incafrent | 0 | 0 | 0 | 0 (11 M2) | $0 | $0 | |
| Sellador Fijador | 0 | 0 | 0 | 0 (11 M2) | $0 | $0 | |
| Revoques | 1 | 1 | 1 | 15 (15 M2) | $280 | $4200 |
| TOTAL MATERIALES | $4200 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | 1 | 5 | $14230.45 | ||
| Finalista | 1 | 5 | $15021.3 | ||
| ALT1 | 1 | 5 | $3250 | ||
| ALT2 | 1 | 5 | $1850 |
| MANO DE OBRA | $28044.5 | ||
| TOTAL CON UTILIDAD | $50480.1 |
| JORNALES TRANSCURRIDOS | 216 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 110 | 50 | 5500 | 6870.35 |
| Hidrolavado | 2 | 1 | 110 | 50 | 5500 | 6870.35 |
| Arreglos | 3 | 3 | 110 | 102 | 11220 | 20611.05 |
| Pintura de paredes | 4 | 0 | 0 | 0 | 0 | 0 |
| extra | 5 | 0 | 0 | 0 | 0 | 0 |
| TOTAL JORNALES X DIAS | $34351.75 | ||||
| TOTAL TAREAS | $22220 | ||||
| DIAS TOTALES | 5 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $4487.12 | USD 123.96 |
| UTILIDAD / MAT+M.O. | 70 % | |
| MANO OBRA | $28044.5 | USD 774.73 |
| MATERIALES | $4200 | USD 116.03 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $22435.6 (80 %) | USD 619.79(80 %) |
| SUBTOTAL | $54680.1 | USD 1510.54 |
| BPS | $10229.95 | USD 282.6 |
| IRPF | $0 | USD 0 |
| IVA | $12029.62 | USD332.3191248377 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $22236.57 | $4892.05 | USD 135.14 | ||
| 6 | $11118.29 | $2446.02 | USD 67.57 | $2519.4 | USD 69.6 |
| 10 | $6670.97 | $1467.61 | USD 40.54 | $1570.34 | USD 43.38 |
| 12 | $5559.14 | $1223.01 | USD 33.79 | $1320.85 | USD 36.49 |
| 18 | $3706.1 | $815.34 | USD 22.52 | $880.57 | USD 24.33 |
| 24 | $2779.57 | $611.51 | USD 16.89 | $660.43 | USD 18.24 |
| 36 | $1853.05 | $407.67 | USD 11.26 | $440.28 | USD 12.16 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO ALT1111
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| alquiler del hidrolavado | 0 | 0 | 0 | 0 (15 M2) | $0 | $0 |
| TOTAL MATERIALES | $0 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | 0 | 0 | $0 | ||
| Finalista | 0 | 0 | $0 | ||
| ALT1 | 0 | 0 | $0 | ||
| ALT2 | 0 | 0 | $0 |
| MANO DE OBRA | $0 | ||
| TOTAL CON UTILIDAD | $0 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Hidrolavado | 1 | 0 | 0 | 0 | 0 | 0 |
| TOTAL JORNALES X DIAS | $0 | ||||
| TOTAL TAREAS | $0 | ||||
| DIAS TOTALES | 0 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $NAN | USD NAN |
| UTILIDAD / MAT+M.O. | NAN % | |
| MANO OBRA | $0 | USD 0 |
| MATERIALES | $0 | USD 0 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $0 (0 %) | USD 0(0 %) |
| SUBTOTAL | $0 | USD 0 |
| BPS | $0 | USD 0 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $0 | $0 | USD 0 | ||
| 6 | $0 | $0 | USD 0 | $0 | USD 0 |
| 10 | $0 | $0 | USD 0 | $0 | USD 0 |
| 12 | $0 | $0 | USD 0 | $0 | USD 0 |
| 18 | $0 | $0 | USD 0 | $0 | USD 0 |
| 24 | $0 | $0 | USD 0 | $0 | USD 0 |
| 36 | $0 | $0 | USD 0 | $0 | USD 0 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO ALT1113
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Arena portland | 5 | 1 | 1 | 7 (35 M2) | $740 | $5180 | |
| Sika seal 107 | 1.2 | 3 | 25 | 4 (35 M2) | $2500 | $10000 |
| TOTAL MATERIALES | $15180 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | 1 | 9 | $25614.81 | ||
| MedioOf | 1 | 9 | $21091.59 |
| MANO DE OBRA | $36053.37 | ||
| TOTAL CON UTILIDAD | $66698.7345 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| retiro de baldosas existentes | 1 | 3 | 35 | 228 | 7980 | 15568.8 |
| Carpeta Hidrofuga | 2 | 2 | 35 | 114 | 3990 | 10379.2 |
| Sika Seal 107 | 3 | 2 | 35 | 114 | 3990 | 10379.2 |
| Extras | 4 | 2 | 0 | 10379.2 |
| TOTAL JORNALES X DIAS | $46706.4 | ||||
| TOTAL TAREAS | $15960 | ||||
| DIAS TOTALES | 9 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $3405.04 | USD 93.29 |
| UTILIDAD / MAT+M.O. | 60 % | |
| MANO OBRA | $36053.37 | USD 987.82 |
| MATERIALES | $15180 | USD 415.91 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $30645.36 (85 %) | USD 839.64(85 %) |
| SUBTOTAL | $81878.73 | USD 2243.38 |
| BPS | $16014.105 | USD 438.77 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $27292.91 | $27292.91 | USD 747.79 | ||
| 6 | $13646.46 | $13646.46 | USD 373.9 | $14055.85 | USD 385.11 |
| 10 | $8187.87 | $8187.87 | USD 224.34 | $8761.02 | USD 240.04 |
| 12 | $6823.23 | $6823.23 | USD 186.95 | $7369.09 | USD 201.9 |
| 18 | $4548.82 | $4548.82 | USD 124.63 | $4912.73 | USD 134.6 |
| 24 | $3411.61 | $3411.61 | USD 93.47 | $3684.54 | USD 100.95 |
| 36 | $2274.41 | $2274.41 | USD 62.32 | $2456.36 | USD 67.3 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO ALT1130
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Arena portland | 0 | 0 | 1 (35 M2) | $500 | $500 | ||
| Caucho clorado | 0 | 0 | 40 (35 M2) | $1260 | $50400 |
| TOTAL MATERIALES | $50900 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Finalista | 17 | 3.5 | $180336.71 |
| MANO DE OBRA | $141563.77 | ||
| TOTAL CON UTILIDAD | $268971.163 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| fabricacion | 1 | 2 | 0 | 6008.52 |
| TOTAL JORNALES X DIAS | $6008.52 | ||||
| TOTAL TAREAS | $0 | ||||
| DIAS TOTALES | 2 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $63703.7 | USD 1748.71 |
| UTILIDAD / MAT+M.O. | 66 % | |
| MANO OBRA | $141563.77 | USD 3886.02 |
| MATERIALES | $50900 | USD 1397.24 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $127407.39 (90 %) | USD 3497.42(90 %) |
| SUBTOTAL | $319871.16 | USD 8780.67 |
| BPS | $0 | USD 0 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $106623.72 | $106623.72 | USD 2926.89 | ||
| 6 | $53311.86 | $53311.86 | USD 1463.45 | $54911.22 | USD 1507.35 |
| 10 | $31987.12 | $31987.12 | USD 878.07 | $34226.22 | USD 939.53 |
| 12 | $26655.93 | $26655.93 | USD 731.72 | $28788.4 | USD 790.26 |
| 18 | $17770.62 | $17770.62 | USD 487.82 | $19192.27 | USD 526.84 |
| 24 | $13327.97 | $13327.97 | USD 365.86 | $14394.21 | USD 395.13 |
| 36 | $8885.31 | $8885.31 | USD 243.91 | $9596.13 | USD 263.42 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO FAC1284
| PU |
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| PU | 8 | 3 | 3.6 | 10 (93 M2) | $2500 | $25000 | |
| diluyente rodillos | 0 | 0 | 0 | 1 (93 M2) | $5000 | $5000 |
| TOTAL MATERIALES | $30000 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | 2 | 2 | $11128.54 |
| MANO DE OBRA | $10312.05 | ||
| TOTAL CON UTILIDAD | $23717.715 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|
| TOTAL JORNALES X DIAS | $0 | ||||
| TOTAL TAREAS | $0 | ||||
| DIAS TOTALES | 0 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $INF | USD INF |
| UTILIDAD / MAT+M.O. | 33 % | |
| MANO OBRA | $10312.05 | USD 238.93 |
| MATERIALES | $30000 | USD 695.09 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $13405.67 (130 %) | USD 310.6(130 %) |
| SUBTOTAL | $53717.72 | USD 1244.62 |
| BPS | $6339.168 | USD 146.88 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $17905.91 | $17905.91 | USD 414.87 | ||
| 6 | $8952.95 | $8952.95 | USD 207.44 | $9221.54 | USD 213.66 |
| 10 | $5371.77 | $5371.77 | USD 124.46 | $5747.79 | USD 133.17 |
| 12 | $4476.48 | $4476.48 | USD 103.72 | $4834.6 | USD 112.02 |
| 18 | $2984.32 | $2984.32 | USD 69.15 | $3223.07 | USD 74.68 |
| 24 | $2238.24 | $2238.24 | USD 51.86 | $2417.3 | USD 56.01 |
| 36 | $1492.16 | $1492.16 | USD 34.57 | $1611.53 | USD 37.34 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO ALT1285
| Pintura aberturas |
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| esmalte crisoles 3 en 1 | 8 | 2 | 3.6 | 0 | $1200 | $0 | |
| pinceles etc | 0 | 0 | 1 | $3000 | $3000 | ||
| PU Sumatane | 8 | 2 | 4 | 4 (50 M2) | $2000 | $8000 | |
| Epoxi anti oxido | 8 | 1 | 4 | 2 (50 M2) | $3500 | $7000 | |
| Sikaflex 221 | 1 | 1 | 1 | 6 (6 M2) | $350 | $2100 |
| TOTAL MATERIALES | $20100 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Peon | 1 | 7 | $13405.26 | ||
| Oficial | 1 | 8 | $20771.34 |
| MANO DE OBRA | $30815.38 | ||
| TOTAL CON UTILIDAD | $58549.222 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|
| TOTAL JORNALES X DIAS | $0 | ||||
| TOTAL TAREAS | $0 | ||||
| DIAS TOTALES | 0 |
EXTRAS
| Extra | Costo |
|---|---|
| Hojalatero | 10000 |
| TOTAL EXTRAS | $10000 |
TOTALES
| UTILIDAD / DIA | $INF | USD INF |
| UTILIDAD / MAT+M.O. | 54 % | |
| MANO OBRA | $30815.38 | USD 713.98 |
| MATERIALES | $20100 | USD 465.71 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $27733.84 (90 %) | USD 642.58(90 %) |
| SUBTOTAL | $78649.22 | USD 1822.27 |
| BPS | $20340.984 | USD 471.29 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $26216.41 | $26216.41 | USD 607.42 | ||
| 6 | $13108.2 | $13108.2 | USD 303.71 | $13501.45 | USD 312.82 |
| 10 | $7864.92 | $7864.92 | USD 182.23 | $8415.46 | USD 194.98 |
| 12 | $6554.1 | $6554.1 | USD 151.86 | $7078.43 | USD 164 |
| 18 | $4369.4 | $4369.4 | USD 101.24 | $4718.95 | USD 109.34 |
| 24 | $3277.05 | $3277.05 | USD 75.93 | $3539.21 | USD 82 |
| 36 | $2184.7 | $2184.7 | USD 50.62 | $2359.48 | USD 54.67 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO ALT1292
| Puntos C D y E |
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| varios | 0 | 0 | 1 (6 M2) | $5000 | $5000 |
| TOTAL MATERIALES | $5000 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | 1 | 15 | $37646.24 |
| MANO DE OBRA | $34889.3475 | ||
| TOTAL CON UTILIDAD | $66289.76025 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|
| TOTAL JORNALES X DIAS | $0 | ||||
| TOTAL TAREAS | $0 | ||||
| DIAS TOTALES | 0 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $INF | USD INF |
| UTILIDAD / MAT+M.O. | 79 % | |
| MANO OBRA | $34889.3475 | USD 825.65 |
| MATERIALES | $5000 | USD 118.32 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $31400.41 (90 %) | USD 743.08(90 %) |
| SUBTOTAL | $71289.76 | USD 1687.05 |
| BPS | $23771.88 | USD 562.55 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $23763.25 | $23763.25 | USD 562.35 | ||
| 6 | $11881.63 | $11881.63 | USD 281.18 | $12238.08 | USD 289.61 |
| 10 | $7128.98 | $7128.98 | USD 168.71 | $7628.01 | USD 180.51 |
| 12 | $5940.81 | $5940.81 | USD 140.59 | $6416.07 | USD 151.83 |
| 18 | $3960.54 | $3960.54 | USD 93.73 | $4277.38 | USD 101.22 |
| 24 | $2970.41 | $2970.41 | USD 70.29 | $3208.04 | USD 75.92 |
| 36 | $1980.27 | $1980.27 | USD 46.86 | $2138.69 | USD 50.61 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO ALT1295
| Trabajos interiores |
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|
| TOTAL MATERIALES | $0 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | $0 |
| MANO DE OBRA | $1374.8475 | ||
| TOTAL CON UTILIDAD | $2612.21025 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|
| TOTAL JORNALES X DIAS | $0 | ||||
| TOTAL TAREAS | $0 | ||||
| DIAS TOTALES | 0 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $INF | USD INF |
| UTILIDAD / MAT+M.O. | 90 % | |
| MANO OBRA | $1374.8475 | USD 31.89 |
| MATERIALES | $0 | USD 0 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $1237.36 (90 %) | USD 28.7(90 %) |
| SUBTOTAL | $2612.21 | USD 60.58 |
| BPS | $0 | USD 0 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $870.74 | $870.74 | USD 20.19 | ||
| 6 | $435.37 | $435.37 | USD 10.1 | $448.43 | USD 10.4 |
| 10 | $261.22 | $261.22 | USD 6.06 | $279.51 | USD 6.48 |
| 12 | $217.68 | $217.68 | USD 5.05 | $235.09 | USD 5.45 |
| 18 | $145.12 | $145.12 | USD 3.37 | $156.73 | USD 3.63 |
| 24 | $108.84 | $108.84 | USD 2.52 | $117.55 | USD 2.73 |
| 36 | $72.56 | $72.56 | USD 1.68 | $78.36 | USD 1.82 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
PRESUPUESTO ALT1296
| Pintura Interna |
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura | 8 | 2.5 | 18 | 5 (245 M2) | $4500 | $22500 | |
| Nailon otros | 0 | 0 | 0 (245 M2) | $ | $0 |
| TOTAL MATERIALES | $22500 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| Oficial | 2 | 9 | $44878.34 |
| MANO DE OBRA | $41592.25 | ||
| TOTAL CON UTILIDAD | $79025.275 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Empapelado | 1 | 3 | 0 | 7232.1 |
| TOTAL JORNALES X DIAS | $7232.1 | ||||
| TOTAL TAREAS | $0 | ||||
| DIAS TOTALES | 3 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $12477.68 | USD 283.18 |
| UTILIDAD / MAT+M.O. | 58 % | |
| MANO OBRA | $41592.25 | USD 943.95 |
| MATERIALES | $22500 | USD 510.64 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $37433.03 (90 %) | USD 849.55(90 %) |
| SUBTOTAL | $101525.28 | USD 2304.15 |
| BPS | $28526.256 | USD 647.41 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $33841.76 | $33841.76 | USD 768.05 | ||
| 6 | $16920.88 | $16920.88 | USD 384.02 | $17428.51 | USD 395.55 |
| 10 | $10152.53 | $10152.53 | USD 230.41 | $10863.21 | USD 246.54 |
| 12 | $8460.44 | $8460.44 | USD 192.01 | $9137.28 | USD 207.37 |
| 18 | $5640.29 | $5640.29 | USD 128.01 | $6091.51 | USD 138.25 |
| 24 | $4230.22 | $4230.22 | USD 96.01 | $4568.64 | USD 103.69 |
| 36 | $2820.15 | $2820.15 | USD 64 | $3045.76 | USD 69.12 |
COMENTARIOS
NO HAY ARCHIVOS ADJUNTOS
| ID | # Operario | Nombre Operario | Fecha Asignacion | Asignado Por | Horas | Categoria | |
|---|---|---|---|---|---|---|---|
| 34 | 4 | 2019-11-12 | Test | 5 | Oficial | ||
| 35 | 20 | 2019-11-13 | Gonzalo | 5 | MedioOf | ||
| 38 | 20 | 2019-11-25 | Test | 5 | MedioOf | ||
| 39 | 20 | 2019-11-30 | Test | 5 | MedioOf | ||
| 40 | 3 | Nicolas Olivera | 2019-12-10 | Test | 5 | Oficial | |
| 41 | 11 | Juan Silveira | 2019-12-10 | Test | 5 | Peon |
| ID | Gasto | Concepto | Registrado Por |
|---|
TOTAL: $0
| ID | Pago | Concepto | Registrado Por |
|---|
TOTAL: $0
SELECCION MONEDA PDF/EXCEL:
|
Montevideo, 11 de abril de 2026 PRESUPUESTO ID: ALT1082 Estimado/s señor/es: Andres Gervaz Objeto: [OBJETO] Edificio ubicado en: Ituzaingo 1256 Por medio de la presente le hago llegar el presupuesto por suministro de mano de obra y herramientas necesarios para llevar a cabo dicha obra, PROOBRA, Martín Porcires con numero de rut 217387910015, BPS 6444676 es la empresa contratada que llevará a cabo la tarea descrita y se responsabiliza por la correcta aplicación de los materiales. El siguiente presupuesto incluye: - Mano de obra. - Aportes BPS. - Seguro de responsabilidad civil, BSE. - Inscripción de obra ante entes públicos. - Permisos ante IMM. - SYSO Seguridad y Salud ocupacional. - Suministro de herramientas. - Materiales. - Protección de pisos y equipos etc. - Limpieza fin de obra. - Cierre de obra ante todos los entes. ____________________________________________________________ COTIZACIÓN: 1) FAchada hidrolavado mas rajaduras [COTIZACION] Precio...............................................$
2) [COTIZACION] Precio...............................................$
3) [COTIZACION] Precio...............................................$
4) [COTIZACION] Precio...............................................$
5) [COTIZACION] Precio...............................................$
6) [COTIZACION] Precio...............................................$
7) PU [COTIZACION] Precio...............................................$
8) Pintura aberturas [COTIZACION] Precio...............................................$
9) Puntos C D y E [COTIZACION] Precio...............................................$
10) Trabajos interiores [COTIZACION] Precio...............................................$
11) Pintura Interna [COTIZACION] Precio...............................................$
TOTAL..............................................$
Nota: Los precios incluyen materiales. ____________________________________________________________ COTIZACIÓN: Aportes al BPS, BSE. El monto máximo de aporte al Banco de Previsión Social (BPS) por parte de la parte contratante respecto de esta obra, y que de superarse será de cargo del Contratista, alcanza a la suma de 1) Precio...............................................$
2) Precio...............................................$
3) Precio...............................................$
4) Precio...............................................$
5) Precio...............................................$
6) Precio...............................................$
7) Precio...............................................$
8) Precio...............................................$
9) Precio...............................................$
10) Precio...............................................$
11) Precio...............................................$
TOTAL..................................................$
Nota: serán presentadas ante la administración las boletas y nominas de obra para su pago. ____________________________________________________________ COTIZACIÓN: SYSO, plan y estudio de seguridad e higiene {SYSO} Precio...................................................$
____________________________________________________________ FORMAS DE PAGO: TASA DE INTERES.......................................................%
ENTREGA INICIAL........................................................$
CUOTAS IGUALES Y CONSECUTIVAS VALOR CUOTA.............................................................$
{FORMASPAGO} ____________________________________________________________ TOTALES. MANO DE OBRA Y MATERIALES............$
SYSO..........................................................$
IVA..............................................................$
SUBTOTAL................................................$
BPS.............................................................$
TOTAL.........................................................$
FORMAS DE PAGO FINANCIADO MANO DE OBRA, MATERIALES E IVA. 0 % de entrega inicial al confirmar el trabajo, $ XXXXXX. Saldo en X cuotas mensuales, iguales y consecutivas de $ XXXXXX- Nota: Consultar por otros planes de financiación. Tanto los costos de IMM como BPS no esta incluido en las cuotas, el mismo deberá ser pago con su factura del mes correspondiente. En caso de realizar los pagos a través del estado estamos afiliados a RUPE. COTIZACIÓN. Informe de avance de obra quincenal (opcional). Memoria descriptiva con registros fotográficos de cada etapa. Precio................................................$ 35.000 Inicio de obra: Después de firmar se fija fecha con un plazo de dos meses máximo para el inicio de obra. El plazo de obra: {PLAZO} Jornales: Se estiman 204 jornales. Operarios: El trabajo se realizara con 2 a 4 operarios. El precio es válido por 45 días. El presente presupuesto tiene valor únicamente con el contrato que lo acompaña. Garantía: Los trabajos realizados bajo este presupuesto tienen una garantía por defectos de materiales y mano de obra de 5 años desde la Recepción Definitiva de la Obra. No incluye problemas ocasionados por humedades existentes o futuras por factores externas al presente contrato. El cliente debe de proveer lugar físico, “deposito” para herramientas y materiales. Suministro de electricidad y agua. Si el edificio no cuenta con un baño de servicio, se contratara uno a cuenta del mismo. Instalación de tablero eléctrico provisional, con firma autorizada. Sobre fachada en lugar a convenir la empresa instalara cartel de obrador 1 x 1,5 m aproximado. No incluidos en el precio: o No incluye ningún material, servicio o trabajo no expresamente detallado en la presente cotización. o No incluye reparación, colocación o sustitución de objetos que se encuentren del lado exterior de fachada, balcones, terrazas o donde se realizaran los trabajos. Tales como redes de protección, plantas, muebles, ropa, adornos, cortinas, etc. Para ello se dará aviso con anticipación fechas de inicio de obra. Solicitamos en caso que hayan redes de protección etc. retirarlas para colocar las una vez finalizado la obra. No obstante deciden dejarlo tendremos el mayor cuidado posible. o No incluye tratamientos o arreglos a cerramientos de aberturas. o No incluye arreglos ni impermeabilización de pisos de balcones En caso de existir puntos de su interés que no fueron evaluados en el presente presupuesto quedamos a disposición para coordinar las visitas necesarias y poder evacuar todas las dudas. Por PROOBRA lo saluda muy atentamente. ------------------                            ------------------   Martin Porcires                                  Cliente             099 363 251                                                       |