MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Interior Crisolplus | 8 | 2 | 20 | 8 (614 M2) | $5500 | $44000 | |
| Pintura cielo raso Crisoles | 8 | 2 | 20 | 2 (128 M2) | $3000 | $6000 | |
| Pintura Aberturas Crisoles | 8 | 2 | 3.6 | 2 (20 M2) | $1600 | $3200 | |
| Nailon, cintas, lijas | 1 | 1 | 1 | 1 (1 M2) | $3000 | $3000 | |
| otros | 1 | 1 | 1 | 1 (1 M2) | $27231 | $27231 |
| TOTAL MATERIALES | $83431 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 15 | $35152.65 | ||
| Finalista | 0 | $0 | |||
| Oficial | 1 | 15 | $42691.35 |
| MANO DE OBRA | $60088.95 | ||
| TOTAL CON UTILIDAD | $118976.121 |
| JORNALES TRANSCURRIDOS | 44 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 742 | 12 | 8904 | 5189.6 |
| Lijado de paredes | 2 | 3 | 614 | 22 | 13508 | 15568.8 |
| Lijado de techos | 3 | 2 | 128 | 25 | 3200 | 10379.2 |
| Pintura de paredes | 4 | 3 | 614 | 50 | 30700 | 15568.8 |
| Pintura de techos | 5 | 3 | 128 | 25 | 3200 | 15568.8 |
| Rasqueteado de paredes | 6 | 3 | 125 | 125 | 15625 | 15568.8 |
| TOTAL JORNALES X DIAS | $77844 | ||||
| TOTAL TAREAS | $75137 | ||||
| DIAS TOTALES | 15 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $3925.81 | USD 111.64 |
| UTILIDAD / MAT+M.O. | 41 % | |
| MANO OBRA | $60088.95 | USD 1708.77 |
| MATERIALES | $83431 | USD 2372.56 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $5000 | USD 142.19 |
| UTILIDAD | $58887.17 (98 %) | USD 1674.6(98 %) |
| SUBTOTAL | $207407.12 | USD 5898.11 |
| BPS | $44305.6905 | USD 1259.94 |
| IRPF | $0 | USD 0 |
| IVA | $45629.57 | USD1297.5848144462 |
FINANCIACION SELECCIONADA:
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | Interes 0 % | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 0 cuotas | $INF | $INF | USD INF | $NAN | USD NAN |
OTRAS FINANCIACIONES:
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $84345.56 | $18556.02 | USD 527.68 | ||
| 6 | $42172.78 | $9278.01 | USD 263.84 | $9556.35 | USD 271.76 |
| 10 | $25303.67 | $5566.81 | USD 158.31 | $5956.49 | USD 169.39 |
| 12 | $21086.39 | $4639.01 | USD 131.92 | $5010.13 | USD 142.47 |
| 18 | $14057.59 | $3092.67 | USD 87.95 | $3340.08 | USD 94.98 |
| 24 | $10543.2 | $2319.5 | USD 65.96 | $2505.06 | USD 71.24 |
| 36 | $7028.8 | $1546.34 | USD 43.97 | $1670.05 | USD 47.49 |
COMENTARIOS
ARCHIVOS ADJUNTOS
| Nombre del Archivo | Descargar | Eliminar |
|---|---|---|
| PPTO2_18 de Julio 1070[1009].pdf |
|
PRESUPUESTOS HIJOS

PRESUPUESTO INT1010
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Interior Crisolplus | 8 | 2 | 20 | 4 (260 M2) | $5500 | $22000 | |
| Pintura cielo raso Crisoles | 8 | 2 | 20 | 1 (43 M2) | $3000 | $3000 | |
| Pintura Aberturas | 8 | 2 | 3.6 | 1 (7 M2) | $1600 | $1600 | |
| Nailon, cintas, lijas | 1 | 1 | 1 | 1 (1 M2) | $3000 | $3000 | |
| otros | 1 | 1 | 1 | 1 (1 M2) | $5260 | $5260 |
| TOTAL MATERIALES | $34860 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 6 | $14061.06 | ||
| Finalista | 1 | 6 | $18025.56 |
| MANO DE OBRA | $24757.38 | ||
| TOTAL CON UTILIDAD | $51990.498 |
| JORNALES TRANSCURRIDOS | 14 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 303 | 12 | 3636 | 5347.77 |
| Lijado de paredes | 2 | 2 | 260 | 22 | 5720 | 10695.54 |
| Lijado de techos | 3 | 1 | 43 | 25 | 1075 | 5347.77 |
| Pintura de paredes | 4 | 1 | 260 | 50 | 13000 | 5347.77 |
| Pintura de techos | 5 | 0.5 | 43 | 25 | 1075 | 2673.885 |
| Rasqueteado de paredes | 6 | 0.5 | 32 | 125 | 4000 | 2673.885 |
| TOTAL JORNALES X DIAS | $32086.62 | ||||
| TOTAL TAREAS | $28506 | ||||
| DIAS TOTALES | 6 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $4538.85 | USD 129.07 |
| UTILIDAD / MAT+M.O. | 46 % | |
| MANO OBRA | $24757.38 | USD 704.03 |
| MATERIALES | $34860 | USD 991.33 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $27233.12 (110 %) | USD 774.44(110 %) |
| SUBTOTAL | $86850.5 | USD 2469.8 |
| BPS | $17705.712 | USD 503.5 |
| IRPF | $0 | USD 0 |
| IVA | $19107.11 | USD543.35589364425 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $35319.2 | $7770.22 | USD 220.96 | ||
| 6 | $17659.6 | $3885.11 | USD 110.48 | $4001.66 | USD 113.8 |
| 10 | $10595.76 | $2331.07 | USD 66.29 | $2494.24 | USD 70.93 |
| 12 | $8829.8 | $1942.56 | USD 55.24 | $2097.96 | USD 59.66 |
| 18 | $5886.53 | $1295.04 | USD 36.83 | $1398.64 | USD 39.77 |
| 24 | $4414.9 | $971.28 | USD 27.62 | $1048.98 | USD 29.83 |
| 36 | $2943.27 | $647.52 | USD 18.41 | $699.32 | USD 19.89 |
COMENTARIOS
ARCHIVOS ADJUNTOS
| Nombre del Archivo | Descargar | Eliminar |
|---|---|---|
| PPTO2_18 de Julio 1070[1009].pdf |
|
|
| PPTO2_18 de Julio 1070[1009].pdf |
|
PRESUPUESTO INT1011
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Interior Crisolplus | 8 | 2 | 20 | 4 (285 M2) | $5500 | $22000 | |
| Pintura cielo raso Crisoles | 8 | 2 | 20 | 1 (50 M2) | $3000 | $3000 | |
| Pintura Aberturas | 8 | 2 | 3.6 | 1 (5 M2) | $1600 | $1600 | |
| Nailon, cintas, lijas | 1 | 1 | 1 | 1 (1 M2) | $3000 | $3000 | |
| otros | 1 | 1 | 1 | 1 (1 M2) | $11070 | $11070 |
| TOTAL MATERIALES | $40670 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 7 | $16404.57 | ||
| Finalista | 1 | 7 | $21029.82 |
| MANO DE OBRA | $28883.61 | ||
| TOTAL CON UTILIDAD | $60655.581 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 335 | 12 | 4020 | 5347.77 |
| Lijado de paredes | 2 | 1 | 285 | 22 | 6270 | 5347.77 |
| Lijado de techos | 3 | 1 | 50 | 25 | 1250 | 5347.77 |
| Pintura de paredes | 4 | 2 | 285 | 50 | 14250 | 10695.54 |
| Pintura de techos | 5 | 1 | 50 | 25 | 1250 | 5347.77 |
| Rasqueteado de paredes | 6 | 1 | 95 | 125 | 11875 | 5347.77 |
| TOTAL JORNALES X DIAS | $37434.39 | ||||
| TOTAL TAREAS | $38915 | ||||
| DIAS TOTALES | 7 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $4538.85 | USD 129.07 |
| UTILIDAD / MAT+M.O. | 46 % | |
| MANO OBRA | $28883.61 | USD 821.37 |
| MATERIALES | $40670 | USD 1156.55 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $31771.97 (110 %) | USD 903.51(110 %) |
| SUBTOTAL | $101325.58 | USD 2881.43 |
| BPS | $20656.664 | USD 587.42 |
| IRPF | $0 | USD 0 |
| IVA | $22291.63 | USD633.91525664723 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $41205.74 | $9065.26 | USD 257.79 | ||
| 6 | $20602.87 | $4532.63 | USD 128.9 | $4668.61 | USD 132.76 |
| 10 | $12361.72 | $2719.58 | USD 77.34 | $2909.95 | USD 82.75 |
| 12 | $10301.43 | $2266.31 | USD 64.45 | $2447.61 | USD 69.6 |
| 18 | $6867.62 | $1510.88 | USD 42.97 | $1631.75 | USD 46.4 |
| 24 | $5150.72 | $1133.16 | USD 32.22 | $1223.81 | USD 34.8 |
| 36 | $3433.81 | $755.44 | USD 21.48 | $815.88 | USD 23.2 |
COMENTARIOS
ARCHIVOS ADJUNTOS
| Nombre del Archivo | Descargar | Eliminar |
|---|---|---|
| PPTO2_18 de Julio 1070[1009].pdf |
|
|
| PPTO2_18 de Julio 1070[1009].pdf |
|
|
| PPTO2_18 de Julio 1070[1009].pdf |
|
PRESUPUESTO INT1012
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Interior Crisolplus | 8 | 2 | 20 | 2 (102 M2) | $5500 | $11000 | |
| Pintura cielo raso Crisoles | 8 | 2 | 20 | 1 (14 M2) | $3000 | $3000 | |
| Nailon, cintas, lijas | 1 | 1 | 1 | 1 (1 M2) | $1400 | $1400 | |
| otros | 0 | 0 | 0 (1 M2) | $ | $0 |
| TOTAL MATERIALES | $15400 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 2 | $4687.02 | ||
| Finalista | 1 | 2 | $6008.52 |
| MANO DE OBRA | $8252.46 | ||
| TOTAL CON UTILIDAD | $16504.92 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Lijado de paredes | 1 | 0.5 | 102 | 22 | 2244 | 2673.885 |
| Lijado de techos | 2 | 0.5 | 14 | 25 | 350 | 2673.885 |
| Pintura de paredes | 3 | 0.5 | 102 | 25 | 2550 | 2673.885 |
| Pintura de techos | 4 | 0.5 | 14 | 25 | 350 | 2673.885 |
| Rasqueteado de paredes | 5 | 0 | 116 | 20 | 2320 | 0 |
| TOTAL JORNALES X DIAS | $10695.54 | ||||
| TOTAL TAREAS | $7814 | ||||
| DIAS TOTALES | 2 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $4126.23 | USD 117.34 |
| UTILIDAD / MAT+M.O. | 35 % | |
| MANO OBRA | $8252.46 | USD 234.68 |
| MATERIALES | $15400 | USD 437.94 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $8252.46 (100 %) | USD 234.68(100 %) |
| SUBTOTAL | $31904.92 | USD 907.29 |
| BPS | $5901.904 | USD 167.83 |
| IRPF | $0 | USD 0 |
| IVA | $7019.08 | USD199.60415185554 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $12974.67 | $2854.43 | USD 81.17 | ||
| 6 | $6487.33 | $1427.21 | USD 40.59 | $1470.03 | USD 41.8 |
| 10 | $3892.4 | $856.33 | USD 24.35 | $916.27 | USD 26.06 |
| 12 | $3243.67 | $713.61 | USD 20.29 | $770.7 | USD 21.92 |
| 18 | $2162.44 | $475.74 | USD 13.53 | $513.8 | USD 14.61 |
| 24 | $1621.83 | $356.8 | USD 10.15 | $385.34 | USD 10.96 |
| 36 | $1081.22 | $237.87 | USD 6.76 | $256.9 | USD 7.31 |
COMENTARIOS
ARCHIVOS ADJUNTOS
| Nombre del Archivo | Descargar | Eliminar |
|---|---|---|
| PPTO2_18 de Julio 1070[1009].pdf |
|
|
| PPTO2_18 de Julio 1070[1009].pdf |
|
|
| PPTO2_18 de Julio 1070[1009].pdf |
|
|
| PPTO2_18 de Julio 1070[1009].pdf |
|
PRESUPUESTO INT1099
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Cemento de contacto | 4 | 2 | 4 | 2 (16 M2) | $1500 | $3000 |
| TOTAL MATERIALES | $3000 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 1 | $2343.51 | ||
| Oficial | 1 | 1 | $2846.09 |
| MANO DE OBRA | $4005.93 | ||
| TOTAL CON UTILIDAD | $6409.488 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| colocacion de zocalo | 1 | 1 | 16 | 250 | 4000 | 5189.6 |
| TOTAL JORNALES X DIAS | $5189.6 | ||||
| TOTAL TAREAS | $4000 | ||||
| DIAS TOTALES | 1 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $2403.56 | USD 65.85 |
| UTILIDAD / MAT+M.O. | 34 % | |
| MANO OBRA | $4005.93 | USD 109.75 |
| MATERIALES | $3000 | USD 82.19 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $2403.56 (60 %) | USD 65.85(60 %) |
| SUBTOTAL | $9409.49 | USD 257.78 |
| BPS | $1779.345 | USD 48.75 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $3136.5 | $3136.5 | USD 85.93 | ||
| 6 | $1568.25 | $1568.25 | USD 42.96 | $1615.3 | USD 44.25 |
| 10 | $940.95 | $940.95 | USD 25.78 | $1006.82 | USD 27.58 |
| 12 | $784.12 | $784.12 | USD 21.48 | $846.85 | USD 23.2 |
| 18 | $522.75 | $522.75 | USD 14.32 | $564.57 | USD 15.47 |
| 24 | $392.06 | $392.06 | USD 10.74 | $423.42 | USD 11.6 |
| 36 | $261.37 | $261.37 | USD 7.16 | $282.28 | USD 7.73 |
COMENTARIOS
ARCHIVOS ADJUNTOS
PRESUPUESTO INT1100
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Cemento de contacto | 4 | 2 | 4 | 6 (45 M2) | $1500 | $9000 |
| TOTAL MATERIALES | $9000 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 2 | $4687.02 | ||
| Oficial | 1 | 2 | $5692.18 |
| MANO DE OBRA | $8011.86 | ||
| TOTAL CON UTILIDAD | $12818.976 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| colocacion de zocalo | 1 | 2 | 45 | 180 | 8100 | 10379.2 |
| TOTAL JORNALES X DIAS | $10379.2 | ||||
| TOTAL TAREAS | $8100 | ||||
| DIAS TOTALES | 2 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $2403.56 | USD 65.85 |
| UTILIDAD / MAT+M.O. | 28 % | |
| MANO OBRA | $8011.86 | USD 219.49 |
| MATERIALES | $9000 | USD 246.56 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $4807.12 (60 %) | USD 131.69(60 %) |
| SUBTOTAL | $21818.98 | USD 597.75 |
| BPS | $3558.69 | USD 97.49 |
| IRPF | $0 | USD 0 |
| IVA | $0 | USD0 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $7272.99 | $7272.99 | USD 199.25 | ||
| 6 | $3636.5 | $3636.5 | USD 99.62 | $3745.6 | USD 102.61 |
| 10 | $2181.9 | $2181.9 | USD 59.77 | $2334.63 | USD 63.96 |
| 12 | $1818.25 | $1818.25 | USD 49.81 | $1963.71 | USD 53.8 |
| 18 | $1212.17 | $1212.17 | USD 33.21 | $1309.14 | USD 35.86 |
| 24 | $909.12 | $909.12 | USD 24.91 | $981.85 | USD 26.9 |
| 36 | $606.08 | $606.08 | USD 16.6 | $654.57 | USD 17.93 |
COMENTARIOS
ARCHIVOS ADJUNTOS
PRESUPUESTO INT1147
| 4to Piso Gal London RECTIFICADO |
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Interior Crisolplus | 8 | 2.5 | 18 | 11 (614 M2) | $1300 | $14300 | |
| Pintura cielo raso Crisoles | 8 | 2.5 | 20 | 2 (128 M2) | $1300 | $2600 | |
| Pintura Aberturas Crisoles | 8 | 2 | 3.6 | 2 (20 M2) | $1600 | $3200 | |
| Nailon, cintas, lijas | 1 | 1 | 1 | 1 (1 M2) | $3000 | $3000 | |
| otros | 1 | 1 | 1 | 1 (1 M2) | $5000 | $5000 |
| TOTAL MATERIALES | $28100 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 20 | $46870.2 | ||
| Finalista | 0 | $0 | |||
| Oficial | 1 | 20 | $56921.8 |
| MANO DE OBRA | $80118.6 | ||
| TOTAL CON UTILIDAD | $179465.664 |
| JORNALES TRANSCURRIDOS | 24 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 742 | 12 | 8904 | 5189.6 |
| Lijado de paredes | 2 | 3 | 614 | 22 | 13508 | 15568.8 |
| Lijado de techos | 3 | 2 | 128 | 25 | 3200 | 10379.2 |
| Pintura de paredes | 4 | 3 | 614 | 50 | 30700 | 15568.8 |
| Pintura de techos | 5 | 3 | 128 | 25 | 3200 | 15568.8 |
| Rasqueteado de paredes | 6 | 3 | 125 | 125 | 15625 | 15568.8 |
| TOTAL JORNALES X DIAS | $77844 | ||||
| TOTAL TAREAS | $75137 | ||||
| DIAS TOTALES | 15 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $6623.14 | USD 188.34 |
| UTILIDAD / MAT+M.O. | 92 % | |
| MANO OBRA | $80118.6 | USD 2278.36 |
| MATERIALES | $28100 | USD 799.09 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $0 | USD 0 |
| UTILIDAD | $99347.06 (124 %) | USD 2825.17(124 %) |
| SUBTOTAL | $207565.66 | USD 5902.62 |
| BPS | $59074.254 | USD 1679.92 |
| IRPF | $0 | USD 0 |
| IVA | $45664.45 | USD1298.5767097967 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $84410.04 | $18570.21 | USD 528.09 | ||
| 6 | $42205.02 | $9285.1 | USD 264.04 | $9563.65 | USD 271.97 |
| 10 | $25323.01 | $5571.06 | USD 158.43 | $5961.03 | USD 169.52 |
| 12 | $21102.51 | $4642.55 | USD 132.02 | $5013.95 | USD 142.58 |
| 18 | $14068.34 | $3095.03 | USD 88.01 | $3342.63 | USD 95.06 |
| 24 | $10551.25 | $2321.28 | USD 66.01 | $2506.98 | USD 71.29 |
| 36 | $7034.17 | $1547.52 | USD 44.01 | $1671.32 | USD 47.53 |
COMENTARIOS
ARCHIVOS ADJUNTOS
PRESUPUESTO INT1148
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Interior Crisolplus | 8 | 2 | 20 | 8 (614 M2) | $5500 | $44000 | |
| Pintura cielo raso Crisoles | 8 | 2 | 20 | 2 (128 M2) | $3000 | $6000 | |
| Pintura Aberturas Crisoles | 8 | 2 | 3.6 | 2 (20 M2) | $1600 | $3200 | |
| Nailon, cintas, lijas | 1 | 1 | 1 | 1 (1 M2) | $3000 | $3000 | |
| otros | 1 | 1 | 1 | 1 (1 M2) | $27231 | $27231 |
| TOTAL MATERIALES | $83431 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 15 | $35152.65 | ||
| Finalista | 0 | $0 | |||
| Oficial | 1 | 15 | $42691.35 |
| MANO DE OBRA | $60088.95 | ||
| TOTAL CON UTILIDAD | $118976.121 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 742 | 12 | 8904 | 5189.6 |
| Lijado de paredes | 2 | 3 | 614 | 22 | 13508 | 15568.8 |
| Lijado de techos | 3 | 2 | 128 | 25 | 3200 | 10379.2 |
| Pintura de paredes | 4 | 3 | 614 | 50 | 30700 | 15568.8 |
| Pintura de techos | 5 | 3 | 128 | 25 | 3200 | 15568.8 |
| Rasqueteado de paredes | 6 | 3 | 125 | 125 | 15625 | 15568.8 |
| TOTAL JORNALES X DIAS | $77844 | ||||
| TOTAL TAREAS | $75137 | ||||
| DIAS TOTALES | 15 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $3925.81 | USD 111.64 |
| UTILIDAD / MAT+M.O. | 41 % | |
| MANO OBRA | $60088.95 | USD 1708.77 |
| MATERIALES | $83431 | USD 2372.56 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $5000 | USD 142.19 |
| UTILIDAD | $58887.17 (98 %) | USD 1674.6(98 %) |
| SUBTOTAL | $207407.12 | USD 5898.11 |
| BPS | $44305.6905 | USD 1259.94 |
| IRPF | $0 | USD 0 |
| IVA | $45629.57 | USD1297.5848144462 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $84345.56 | $18556.02 | USD 527.68 | ||
| 6 | $42172.78 | $9278.01 | USD 263.84 | $9556.35 | USD 271.76 |
| 10 | $25303.67 | $5566.81 | USD 158.31 | $5956.49 | USD 169.39 |
| 12 | $21086.39 | $4639.01 | USD 131.92 | $5010.13 | USD 142.47 |
| 18 | $14057.59 | $3092.67 | USD 87.95 | $3340.08 | USD 94.98 |
| 24 | $10543.2 | $2319.5 | USD 65.96 | $2505.06 | USD 71.24 |
| 36 | $7028.8 | $1546.34 | USD 43.97 | $1670.05 | USD 47.49 |
COMENTARIOS
ARCHIVOS ADJUNTOS
PRESUPUESTO INT1149
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Interior Crisolplus | 8 | 2 | 20 | 8 (614 M2) | $5500 | $44000 | |
| Pintura cielo raso Crisoles | 8 | 2 | 20 | 2 (128 M2) | $3000 | $6000 | |
| Pintura Aberturas Crisoles | 8 | 2 | 3.6 | 2 (20 M2) | $1600 | $3200 | |
| Nailon, cintas, lijas | 1 | 1 | 1 | 1 (1 M2) | $3000 | $3000 | |
| otros | 1 | 1 | 1 | 1 (1 M2) | $27231 | $27231 |
| TOTAL MATERIALES | $83431 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 15 | $35152.65 | ||
| Finalista | 0 | $0 | |||
| Oficial | 1 | 15 | $42691.35 |
| MANO DE OBRA | $60088.95 | ||
| TOTAL CON UTILIDAD | $118976.121 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 742 | 12 | 8904 | 5189.6 |
| Lijado de paredes | 2 | 3 | 614 | 22 | 13508 | 15568.8 |
| Lijado de techos | 3 | 2 | 128 | 25 | 3200 | 10379.2 |
| Pintura de paredes | 4 | 3 | 614 | 50 | 30700 | 15568.8 |
| Pintura de techos | 5 | 3 | 128 | 25 | 3200 | 15568.8 |
| Rasqueteado de paredes | 6 | 3 | 125 | 125 | 15625 | 15568.8 |
| TOTAL JORNALES X DIAS | $77844 | ||||
| TOTAL TAREAS | $75137 | ||||
| DIAS TOTALES | 15 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $3925.81 | USD 111.64 |
| UTILIDAD / MAT+M.O. | 41 % | |
| MANO OBRA | $60088.95 | USD 1708.77 |
| MATERIALES | $83431 | USD 2372.56 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $5000 | USD 142.19 |
| UTILIDAD | $58887.17 (98 %) | USD 1674.6(98 %) |
| SUBTOTAL | $207407.12 | USD 5898.11 |
| BPS | $44305.6905 | USD 1259.94 |
| IRPF | $0 | USD 0 |
| IVA | $45629.57 | USD1297.5848144462 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $84345.56 | $18556.02 | USD 527.68 | ||
| 6 | $42172.78 | $9278.01 | USD 263.84 | $9556.35 | USD 271.76 |
| 10 | $25303.67 | $5566.81 | USD 158.31 | $5956.49 | USD 169.39 |
| 12 | $21086.39 | $4639.01 | USD 131.92 | $5010.13 | USD 142.47 |
| 18 | $14057.59 | $3092.67 | USD 87.95 | $3340.08 | USD 94.98 |
| 24 | $10543.2 | $2319.5 | USD 65.96 | $2505.06 | USD 71.24 |
| 36 | $7028.8 | $1546.34 | USD 43.97 | $1670.05 | USD 47.49 |
COMENTARIOS
ARCHIVOS ADJUNTOS
PRESUPUESTO INT1150
MATERIALES
| Material | ID Tarea | Rendimiento | Manos | Litros | Cantidad | Costo Unitario | Costo Total |
|---|---|---|---|---|---|---|---|
| Pintura Interior Crisolplus | 8 | 2 | 20 | 8 (614 M2) | $5500 | $44000 | |
| Pintura cielo raso Crisoles | 8 | 2 | 20 | 2 (128 M2) | $3000 | $6000 | |
| Pintura Aberturas Crisoles | 8 | 2 | 3.6 | 2 (20 M2) | $1600 | $3200 | |
| Nailon, cintas, lijas | 1 | 1 | 1 | 1 (1 M2) | $3000 | $3000 | |
| otros | 1 | 1 | 1 | 1 (1 M2) | $27231 | $27231 |
| TOTAL MATERIALES | $83431 |
OPERARIOS
| Categoria Operario | ID Tarea | Cantidad | Jornales | Comentario | Total |
|---|---|---|---|---|---|
| MedioOf | 1 | 15 | $35152.65 | ||
| Finalista | 0 | $0 | |||
| Oficial | 1 | 15 | $42691.35 |
| MANO DE OBRA | $60088.95 | ||
| TOTAL CON UTILIDAD | $118976.121 |
| JORNALES TRANSCURRIDOS | 0 |
REPLANTEO DE TAREAS
| Tarea | ID Tarea | Dias | M2 | $/M2 | Costo Total | Jornales x Dias |
|---|---|---|---|---|---|---|
| Implantación de obra | 1 | 1 | 742 | 12 | 8904 | 5189.6 |
| Lijado de paredes | 2 | 3 | 614 | 22 | 13508 | 15568.8 |
| Lijado de techos | 3 | 2 | 128 | 25 | 3200 | 10379.2 |
| Pintura de paredes | 4 | 3 | 614 | 50 | 30700 | 15568.8 |
| Pintura de techos | 5 | 3 | 128 | 25 | 3200 | 15568.8 |
| Rasqueteado de paredes | 6 | 3 | 125 | 125 | 15625 | 15568.8 |
| TOTAL JORNALES X DIAS | $77844 | ||||
| TOTAL TAREAS | $75137 | ||||
| DIAS TOTALES | 15 |
EXTRAS
| Extra | Costo |
|---|
| TOTAL EXTRAS | $0 |
TOTALES
| UTILIDAD / DIA | $3925.81 | USD 111.64 |
| UTILIDAD / MAT+M.O. | 41 % | |
| MANO OBRA | $60088.95 | USD 1708.77 |
| MATERIALES | $83431 | USD 2372.56 |
| SYSO | $0 | USD 0 |
| RESP CIVIL | $0 | USD 0 |
| IMM | $0 | USD 0 |
| INC OBRA | $5000 | USD 142.19 |
| UTILIDAD | $58887.17 (98 %) | USD 1674.6(98 %) |
| SUBTOTAL | $207407.12 | USD 5898.11 |
| BPS | $44305.6905 | USD 1259.94 |
| IRPF | $0 | USD 0 |
| IVA | $45629.57 | USD1297.5848144462 |
| Plan de Pagos | Valor Cuota | IVA Incluido | USD | C/Recargo | USD |
|---|---|---|---|---|---|
| 0 % Inicio | $0 | $0 | USD 0 | ||
| 3 | $84345.56 | $18556.02 | USD 527.68 | ||
| 6 | $42172.78 | $9278.01 | USD 263.84 | $9556.35 | USD 271.76 |
| 10 | $25303.67 | $5566.81 | USD 158.31 | $5956.49 | USD 169.39 |
| 12 | $21086.39 | $4639.01 | USD 131.92 | $5010.13 | USD 142.47 |
| 18 | $14057.59 | $3092.67 | USD 87.95 | $3340.08 | USD 94.98 |
| 24 | $10543.2 | $2319.5 | USD 65.96 | $2505.06 | USD 71.24 |
| 36 | $7028.8 | $1546.34 | USD 43.97 | $1670.05 | USD 47.49 |
COMENTARIOS
ARCHIVOS ADJUNTOS
| ID | # Operario | Nombre Operario | Fecha Asignacion | Asignado Por | Horas | Categoria | |
|---|---|---|---|---|---|---|---|
| 4 | 12 | 2019-08-20 | Prueba | 1 | Peon | ||
| 16 | 10 | 2019-09-02 | Test | 6 | Oficial | ||
| 17 | 16 | 2019-09-02 | Test | 6 |
| ID | Gasto | Concepto | Registrado Por |
|---|---|---|---|
| 57 | 10625 | (MO) Sueldo Roman | Test |
| 58 | 7895 | (MO) Sueldo Jose Rocha | Test |
| 77 | 1517 | (MAT) Uniformes | Test |
| 78 | 527 | (MAT) Ferreteria | Test |
| 79 | 2600 | (MO) Fijador- sellador al agua | Test |
| 80 | 5080 | (MO) Crisoles | Test |
| 82 | 10469 | (MO) sueldo Roman | Test |
| 83 | 7760 | (MO) Sueldo Jose Luis | Test |
| 86 | 10625 | (MO) Jornales Roman | Test |
| 87 | 7895 | (MO) Jornales Jose Luis | Test |
TOTAL: $64993
| ID | Pago | Concepto | Registrado Por |
|---|
TOTAL: $0
SELECCION MONEDA PDF/EXCEL:
|
Montevideo, 11 de abril de 2026 PRESUPUESTO ID: INT1009 Estimado/s señor/es: Beatriz Objeto: [OBJETO] Edificio ubicado en: 18 de Julio 1070 Por medio de la presente le hago llegar el presupuesto por suministro de mano de obra y herramientas necesarios para llevar a cabo dicha obra, PROOBRA, Martín Porcires con numero de rut 217387910015, BPS 6444676 es la empresa contratada que llevará a cabo la tarea descrita y se responsabiliza por la correcta aplicación de los materiales. El siguiente presupuesto incluye: - Mano de obra. - Aportes BPS. - Seguro de responsabilidad civil, BSE. - Inscripción de obra ante entes públicos. - Permisos ante IMM. - SYSO Seguridad y Salud ocupacional. - Suministro de herramientas. - Materiales. - Protección de pisos y equipos etc. - Limpieza fin de obra. - Cierre de obra ante todos los entes. ____________________________________________________________ COTIZACIÓN: 1) [COTIZACION] Precio...............................................$
2) [COTIZACION] Precio...............................................$
3) [COTIZACION] Precio...............................................$
4) [COTIZACION] Precio...............................................$
5) [COTIZACION] Precio...............................................$
6) [COTIZACION] Precio...............................................$
7) 4to Piso Gal London RECTIFICADO [COTIZACION] Precio...............................................$
8) [COTIZACION] Precio...............................................$
9) [COTIZACION] Precio...............................................$
10) [COTIZACION] Precio...............................................$
TOTAL..............................................$
Nota: Los precios incluyen materiales. ____________________________________________________________ COTIZACIÓN: Aportes al BPS, BSE. El monto máximo de aporte al Banco de Previsión Social (BPS) por parte de la parte contratante respecto de esta obra, y que de superarse será de cargo del Contratista, alcanza a la suma de 1) Precio...............................................$
2) Precio...............................................$
3) Precio...............................................$
4) Precio...............................................$
5) Precio...............................................$
6) Precio...............................................$
7) Precio...............................................$
8) Precio...............................................$
9) Precio...............................................$
10) Precio...............................................$
TOTAL..................................................$
Nota: serán presentadas ante la administración las boletas y nominas de obra para su pago. ____________________________________________________________ COTIZACIÓN: Inscripción de obra • Inscripción ante entes públicos: BPS/MTSS/FOCER • Clausura ante entes correspondientes • Clausura ante BPS Será necesario presentar para inscribir la obra ante BPS presupuesto firmado por ambas partes y factura de tributos municipales o contribución inmobiliaria. Minuta notarial. Precio...................................................$
____________________________________________________________ FORMAS DE PAGO: TASA DE INTERES.......................................................%
ENTREGA INICIAL........................................................$
CUOTAS IGUALES Y CONSECUTIVAS VALOR CUOTA.............................................................$
{FORMASPAGO} ____________________________________________________________ TOTALES. MANO DE OBRA Y MATERIALES............$
Inscripcion Obra........................................$
IVA..............................................................$
SUBTOTAL................................................$
BPS.............................................................$
TOTAL.........................................................$
FORMAS DE PAGO FINANCIADO MANO DE OBRA, MATERIALES E IVA. 0 % de entrega inicial al confirmar el trabajo, $ XXXXXX. Saldo en X cuotas mensuales, iguales y consecutivas de $ XXXXXX- Nota: Consultar por otros planes de financiación. Tanto los costos de IMM como BPS no esta incluido en las cuotas, el mismo deberá ser pago con su factura del mes correspondiente. En caso de realizar los pagos a través del estado estamos afiliados a RUPE. COTIZACIÓN. Informe de avance de obra quincenal (opcional). Memoria descriptiva con registros fotográficos de cada etapa. Precio................................................$ 35.000 Inicio de obra: Después de firmar se fija fecha con un plazo de dos meses máximo para el inicio de obra. El plazo de obra: {PLAZO} Jornales: Se estiman 362 jornales. Operarios: El trabajo se realizara con 2 a 4 operarios. El precio es válido por 45 días. El presente presupuesto tiene valor únicamente con el contrato que lo acompaña. Garantía: Los trabajos realizados bajo este presupuesto tienen una garantía por defectos de materiales y mano de obra de 5 años desde la Recepción Definitiva de la Obra. No incluye problemas ocasionados por humedades existentes o futuras por factores externas al presente contrato. El cliente debe de proveer lugar físico, “deposito” para herramientas y materiales. Suministro de electricidad y agua. Si el edificio no cuenta con un baño de servicio, se contratara uno a cuenta del mismo. Instalación de tablero eléctrico provisional, con firma autorizada. Sobre fachada en lugar a convenir la empresa instalara cartel de obrador 1 x 1,5 m aproximado. No incluidos en el precio: o No incluye ningún material, servicio o trabajo no expresamente detallado en la presente cotización. o No incluye reparación, colocación o sustitución de objetos que se encuentren del lado exterior de fachada, balcones, terrazas o donde se realizaran los trabajos. Tales como redes de protección, plantas, muebles, ropa, adornos, cortinas, etc. Para ello se dará aviso con anticipación fechas de inicio de obra. Solicitamos en caso que hayan redes de protección etc. retirarlas para colocar las una vez finalizado la obra. No obstante deciden dejarlo tendremos el mayor cuidado posible. o No incluye tratamientos o arreglos a cerramientos de aberturas. o No incluye arreglos ni impermeabilización de pisos de balcones En caso de existir puntos de su interés que no fueron evaluados en el presente presupuesto quedamos a disposición para coordinar las visitas necesarias y poder evacuar todas las dudas. Por PROOBRA lo saluda muy atentamente. ------------------                            ------------------   Martin Porcires                                  Cliente             099 363 251                                                       |